The first call most business owners make when they sign a lease is to their moving company. The second is to their furniture dealer. The internet provider call comes weeks later, sometimes the week before move-in, when someone asks whether Wi-Fi will be ready on day one.
That is the single most expensive scheduling mistake in a business relocation. Business-class internet at a new address is not a service you activate with a phone call. Depending on the building, it is a circuit order that can take 30 to 90 days to provision or a fiber installation project that takes three to six months and costs $10,000 to $50,000 (source: JumpStart Technology, 2026). The difference between those two outcomes comes down to what infrastructure the building already has, and whether you asked before you signed.
Why Business Internet Is Different From Home Internet
Residential internet is largely plug-and-play. A technician runs a coax drop to your address, and you are live in a few days. Business internet, particularly fiber, works differently. The carrier has to provision a dedicated circuit from their nearest point of presence to the building. If the building already has fiber infrastructure from that carrier, provisioning takes 30 to 90 days. If the carrier has to run new fiber to the building, you are looking at a construction project with a separate timeline and a separate cost.
That distinction matters because fiber cable itself is in tight supply right now. According to United Tel Supply (October 2026), fiber cable lead times have roughly doubled in recent years, from around 10 weeks to around 20 weeks, driven by infrastructure buildout demand. Carriers are managing their own backlogs. When you call to order a circuit, you are entering a queue.
The Three Scenarios You Can Find Yourself In
Scenario 1: The carrier already has fiber in the building
This is the best case. You call, place the circuit order, and provisioning runs its normal 30 to 90 day course. You are live on or near your move date if you ordered at least 60 days out. Most modern commercial buildings in dense metro areas fall into this category, but you need to confirm it rather than assume it.
Scenario 2: The carrier needs to bring fiber to the building
This is where the timeline breaks. A new fiber build requires the carrier to pull cable from their nearest fiber node to your building’s MPOE (minimum point of entry), negotiate access with the building owner, pull permits in some cases, and then provision the circuit. Total time: three to six months from order to live, sometimes longer in congested areas. Cost: $10,000 to $50,000 depending on distance and conditions, though some carriers recover this through long-term contract commitments rather than an upfront charge.
Finding this out the week before you move gives you exactly zero time to act on it. Finding it out before you sign gives you options: negotiate with the landlord to bear the build cost, choose a different address where your preferred carrier already has fiber, or factor in the timeline and adjust your move date.
Scenario 3: No business-grade provider serves the address
Less common in Atlanta metro but not rare in office parks that developed before carrier fiber investment caught up. You end up on a cable provider’s business plan, which typically means shared bandwidth and no SLA commitments. For businesses that depend on reliable upload speeds, VoIP, or cloud applications with low-latency requirements, this matters. A prospective tenant who knows this before signing has the option to walk away or negotiate a tenant improvement allowance toward the build cost.
One question to ask before you sign any commercial lease: “Which fiber carriers have existing infrastructure in this building?” The building manager or your commercial real estate agent should be able to answer this. If they cannot, ask your IT provider to check carrier availability for the address directly. This is a five-minute call that can change the trajectory of your move entirely.
The Ordering Process and What Goes Wrong
Assuming you have a carrier that serves the building, the circuit order process looks like this: you call or request a quote online, a carrier rep runs a feasibility check, you sign the service agreement, and provisioning begins. That provisioning window, typically 30 to 90 days, covers the time the carrier needs to schedule their technicians, run the circuit from the building distribution point to your suite, install the demarcation equipment, and complete the network handoff.
What goes wrong: orders placed without a confirmed suite number or floor. Incomplete contact information that delays scheduling. Miscommunication between the carrier and building management about access. A technician no-show that pushes the installation two weeks. None of these are unusual. All of them push your live date later. If you placed the order with a 45-day buffer and one of these adds 14 days, you still make it. If you placed the order two weeks before move day, you do not.
Temporary internet while you wait
If you know you will be in a gap, plan for it. 4G/5G business cellular routers can provide usable speeds for small teams and are available on month-to-month terms from most major carriers. This is not a substitute for a dedicated fiber circuit under load, but it keeps email, video calls, and cloud applications running during a two- or three-week provisioning delay. Have the backup option ordered before you need it, not after the main circuit is already late.
What This Means for Your Move Timeline
Working backwards from a move date, here is the ordering logic:
If your preferred carrier is already in the building, place the circuit order 60 to 75 days before move-in. This gives you the 30 to 90 day provisioning window plus a buffer for scheduling delays. Do not wait for the lease to fully execute before making the call. The order can be placed as soon as you have a confirmed address and suite number.
If the carrier needs to build to the building, the order needs to go in the day you decide this is the address you want, ideally before you sign the lease, so you have time to rethink if the timeline does not work. Three to six months is a long lead time to absorb mid-move.
Internet connectivity is the one item in a business move that you cannot improvise around if it is not ready. Phones can forward to mobile. Files can be accessed from laptops on hotspots. But a business that runs on VoIP, cloud applications, video conferencing, and a hosted POS system cannot operate without internet the way it could in 2005. The order that takes five minutes to place needs 60 to 90 days to execute. Place it first.