Most commercial tenants spend months negotiating rent, TI allowances, and renewal options. They read the lease language carefully and run the numbers. Then they sign and call a moving company.
The questions that do not get asked are the ones that cause the most expensive problems: Which internet carriers have infrastructure in this building? How old is the cabling in the suite? Where does the carrier’s fiber terminate, and will their technician have access to it? Does the electrical panel have capacity for a server closet?
None of these are lease questions. They are building questions. And the time to ask them is before the ink dries, not after your move-in date is locked.
1. Internet Carrier Availability
The most important technology question you can ask about a building is which fiber carriers have existing infrastructure inside it. According to Vertical Systems Group (via Lightwave Online, April 2020), 64.5% of medium-to-large US commercial buildings have access to fiber. That means about one in three does not, and the implications for a business relocation are significant.
When your preferred carrier already has fiber in the building, provisioning a new circuit takes 30 to 90 days. When the carrier has to run fiber to the building from scratch, you are looking at three to six months and a build cost in the tens of thousands of dollars. We cover the lead time question in detail in our post on business internet lead times. The short version: the right time to discover your preferred carrier is not in the building is before you sign, not the week before you move.
Your building manager or commercial real estate agent should be able to tell you which carriers have on-net access. If they cannot, your IT provider can check directly with carriers for the address. This takes one phone call and should happen before you make any commitment on the lease.
2. The Cabling Inside the Suite
Internet connectivity at the building level is one thing. The wiring inside your suite is another. A building can be fully fiber-ready and still have a suite with Cat5 cable run in 2003 that nobody has touched since.
Cat5e supports speeds up to 1 Gbps over short runs. Cat6 supports 1 Gbps cleanly and 10 Gbps over runs under 55 meters. Cat6A supports 10 Gbps over the full 100-meter horizontal run. If your business runs VoIP, video conferencing, cloud applications, and workstations simultaneously, the difference between Cat5e and Cat6A is noticeable under load. According to Fortune Business Insights (reported by The Network Installers, updated September 2026), Cat6 now accounts for roughly 52.8% of new commercial cabling installations.
When you are evaluating a suite, ask: Is there existing cabling? What category? When was it installed? How many drops per workspace? Are runs documented or unknown? In many cases the landlord will not know the answers, which means you should budget for a cabling assessment as part of your due diligence, or factor an unknown cabling situation into your TI allowance negotiation.
3. The MPOE and Carrier Access
MPOE stands for Minimum Point of Entry: the physical location in the building where the carrier’s fiber terminates and your responsibility begins. In most multi-tenant commercial buildings, the MPOE is in a shared telecom room, basement, or first-floor utility space.
Why this matters: when your carrier needs to install or service your circuit, their technician has to access the MPOE. If building management has not given your carrier the access they need, or if the MPOE is in a locked room that requires building staff to escort technicians, a simple service call can turn into a multi-day scheduling problem. Ask the building manager before you sign whether carrier technicians have direct access to the MPOE, or whether they require building escort. This is a detail that affects every service call for the life of your lease.
4. Electrical Capacity for a Server Closet
If your business needs any kind of on-premise equipment, a server closet, a UPS, a network rack with a patch panel and managed switches, you need to know what electrical capacity that space has before you commit. A typical small server closet running a rack of equipment and a UPS needs at least one or two dedicated 20-amp circuits, and in some cases a small split-system air conditioning unit to keep temperatures in range.
Older commercial suites, particularly those in buildings constructed before 2000, may have limited panel capacity with no room to add circuits without an upgrade. The landlord may allow this work or may treat it as a capital project requiring building approval, permits, and an electrician of their choosing. Understanding the electrical baseline before you sign avoids a situation where your IT buildout hits a wall because the panel is full.
5. Cell Signal Inside the Building
This one is easy to overlook because you are standing outside in the parking lot when you tour the space. Walk the suite during your visit and check signal on your carrier. Walk to the interior rooms, the bathrooms, the conference rooms away from the windows. Some buildings, particularly those with dense concrete construction or underground spaces, have poor in-building cellular coverage that cannot be fixed without a distributed antenna system (DAS) or carrier-specific small cells, neither of which is a simple or inexpensive fix.
For businesses that rely on mobile-first workflows, where staff primarily communicate by phone and VoIP over mobile, poor cell signal inside the building is a real operational problem. It is also a negotiating point: if the building has poor signal and you can document it, you have grounds to ask the landlord to address it before move-in or to factor in a TI allowance toward a solution.
6. Landlord Restrictions on Cabling
Every commercial lease has language about tenant improvements and modifications to the premises. What varies is how that language applies to structured cabling work. Some landlords treat low-voltage cabling as a standard tenant improvement that you can run with standard notification. Others require pre-approval of any cabling work, specify which contractors can do it, and require that cabling be removed at the end of the lease at tenant expense.
These restrictions matter because structured cabling is the foundation of your entire network. If your lease requires building-approved contractors for cabling work and that approval process takes two months, your project timeline changes. If your lease requires you to de-install all cabling at termination, that is a cost to factor into your occupancy analysis.
Ask your real estate attorney to flag any lease language that applies to low-voltage wiring, telecommunications, and tenant improvement work. Ask the building manager what the practical process looks like: who approves it, how long it takes, and whether they have a preferred vendor list. Understanding this before you sign is far better than discovering it when you are trying to get cabling done two weeks before your staff moves in.
Bringing an IT provider into the site evaluation early changes the outcome. A one-hour walkthrough of a prospective suite by someone who knows what to look for, MPOE location, panel capacity, existing cabling condition, ceiling height and routing options, cell signal, costs far less than the change orders and delays that come from discovering these things after the lease is signed. See our structured cabling page for how we approach commercial network buildouts in Atlanta metro.
A Checklist Before You Sign
These are the questions worth answering before any commercial lease commitment:
Which fiber carriers have existing infrastructure in the building? Can they serve your suite at your required bandwidth? What is the provisioning timeline?
What category of cabling exists in the suite, when was it installed, and how many drops are in each workspace? Is the run documentation available?
Where is the MPOE? Do carrier technicians have independent access, or does access require building staff?
What is the electrical panel capacity in or near the suite? Are there available circuits for a server closet? What is the landlord’s process for adding circuits?
What is the cell signal from the two or three carriers your team uses? Walk the interior rooms, not just the perimeter.
What does the lease say about low-voltage cabling work? Are there preferred contractors? Is removal required at lease end?
None of these are complicated questions. Most take a few minutes to answer. Together, they give you a complete picture of the technology infrastructure you are committing to for the term of the lease, and they give you something to negotiate with if the answers reveal problems.