Every task that has to happen before your team sits down in the new building, in the order it has to happen. Written from real moves across metro Atlanta.

Talk to Us About Your Move →See Our Relocation Service

Most move checklists are about furniture. This one is about the part that actually stops your business working: the circuit that was ordered too late, the phone numbers that could not be ported in time, the cable that stopped three feet short of where the cameras needed to go.

Work backward from your move date. The dates below are the ones that matter, and the first one is earlier than most people expect.

One Item Decides Your Move Date

The internet circuit. A suite that already has service can be turned up quickly. A suite that needs a new fiber build can take 30 to 90 days, longer if the carrier needs a permit or has to cross a road. Nothing else on this list has that kind of lead time, and no amount of pressure shortens a construction schedule.

If you read nothing else here: find out what is serviceable at the new address before you sign the lease.

Work Backward From Your Move Date

Six phases. The first one starts before you sign the lease.
90+ Days Out

Before You
Sign

Everything here is cheaper to discover now than at any later point.

  • Check what internet service is actually available at the exact suite, not the building and not the coverage map
  • Ask the landlord where service enters the building and where the demarcation point sits
  • Confirm whether the ceiling is a return-air plenum, which dictates cable type
  • Find out what the landlord will let you penetrate, core or attach to
  • Ask what the building provides versus what you install and remove at lease end
  • Identify a realistic location for a server closet or rack, with power nearby
60 to 90 Days

Order the
Long Poles

These are the items with lead times you do not control.

  • Order the internet circuit and get a firm order commitment date in writing
  • Order a second circuit or wireless backup if downtime is expensive for you
  • Start the phone number porting paperwork with your current carrier
  • Order any long-lead hardware: firewall, switches, access points, cameras, door controllers
  • Book the certificate of insurance and after-hours building access with the property manager
  • Reserve the freight elevator for both buildings if you need one
30 to 60 Days

Design and
Cable

Cable goes in while the ceiling is open and before furniture arrives. This is the cheapest hour of the whole project.

  • Finalize the floor plan and mark every desk, printer, camera, access point and door
  • Pull cable to all of it in one pass, including drops you are not sure you need yet
  • Terminate to a labeled patch panel and certify every run, with a report per run
  • Install the rack, switches, firewall and UPS
  • Place wireless access points against the real walls, not an even grid on paper
  • Mount cameras and door hardware and confirm sight lines before the space fills up
2 to 4 Weeks

Build and
Pre-Stage

By the end of this phase the new office should be a working office that happens to be empty.

  • Turn up and test the internet circuit at the new address
  • Configure VLANs, firewall policy and wireless, and test them under load
  • Image and stage workstations so they are ready to plug in
  • Confirm the number port date in writing and tell your team what will happen
  • Update the address everywhere it appears: Google Business Profile, website, invoices, letterhead
  • Decide what is being retired rather than moved, and plan secure disposal for anything holding data
Move Week

Cutover

Sequence matters more than speed here.

  • Port numbers on a scheduled window, not on the busiest morning of the week
  • Take a verified backup of every server before anything is unplugged
  • Shut servers down on a planned sequence and bring them up against a checklist
  • Physically move and reconnect, confirming each system as it comes back
  • Test phones, internet, printing, shared drives and cameras before anyone arrives
Day One

The Morning
After

Day one is when you find the things no plan catches.

  • Have someone technical on site for the first working morning
  • Expect the printer nobody mentioned and the application that hard-codes an old IP address
  • Walk the building and check wireless in the corners people actually sit in
  • Confirm every member of staff can log in, print and make a call
  • Collect the as-builts, rack diagram and cable labels, and put them somewhere findable

The Four We See Most

The circuit was ordered too late

By far the most common. The lease is signed, the furniture is ordered, and the internet is 60 days out. Order it first.

Porting was treated as a formality

Number porting is scheduled with the losing carrier and does not tolerate improvisation. Start it early and cut over in a survivable window.

Cable stopped short of the cameras

Camera and door locations get decided after the cabling contractor has left. Decide them before the ceiling closes.

Security quietly degraded

Firewall rules get copied without review, old accounts survive the move, and the guest network gets rebuilt in a hurry. Rebuild it deliberately.

Want Someone to Run This For You?

Tell us the address and the date. We will tell you what is serviceable at that building, what the real lead times are, and what the sequence needs to look like. No charge for the conversation.

Talk to Us About Your Move →